Skip to content
MT Hauptstadt Projektbau GmbH

References

A selection of our completed projects.

An insight into our work – from house clearance to refurbishment.

References

Real projects

Each photo pair shows the same area of the same project – honestly documented from strip-out to handover.

Bathroom – complete refurbishment

Bathroom at the start of refurbishment: floor covering removed, old substrate exposedBefore
The same bathroom after refurbishment: new shower with a folding glass door by the windowAfter

Same bathroom, same window – old floor out, new glass-enclosed shower in.

Construction & Refurbishment

Bathroom – ceiling renovation

Damp-stained ceiling above the shower enclosure before restorationBefore
The same ceiling above the shower, smoothly skimmed and freshly paintedAfter

The same ceiling corner above the shower – from damp staining to a smooth, freshly painted finish.

Renovation & Painting

Basement – damp damage repaired

Basement wall with clear damp staining before refurbishmentBefore
The same basement wall after refurbishment: dry, made good and freshly paintedAfter

The same wall – damp damage dealt with, substrate made good, freshly painted.

Construction & Refurbishment

References

Our photo archive by area of work

All further genuine photos from our projects, sorted by area of work – starting condition, work in progress and finished results.

Clearance, house clearance & strip-out

31
Living room after strip-out with removed wallpaperBefore
Period bathroom fully stripped back to shellBefore
Stripped-out room with exposed masonry before refurbishmentBefore
Bathroom during strip-out: tiles removed down to the masonry, tub taken outBefore
Opened-up, damp-damaged bathroom ceiling before refurbishmentBefore
Living space before the clearanceBefore
Cluttered flat before the house clearanceBefore
Room full of household goods before clearingBefore
Stripped-out room with exposed masonryBefore
Bathroom during strip-out before the rebuildBefore
Living space before the clearanceBefore
Cluttered flat before the house clearanceBefore
Room full of household goods before clearingBefore
Stripped-out room with exposed masonryBefore
Bathroom during strip-out before the rebuildBefore
Living space before the clearanceBefore
Cluttered flat before the house clearanceBefore
Room full of household goods before clearingBefore
Stripped-out room with exposed masonryBefore
Bathroom during strip-out before the rebuildBefore
Living space before the clearanceBefore
Cluttered flat before the house clearanceBefore
Room full of household goods before clearingBefore
Cleared flat after the clearance
Living space handed over swept clean
Emptied room after the house clearance
Cleared flat after the clearance
Living space handed over swept clean
Emptied room after the house clearance
Cleared flat after the clearance
Living space handed over swept clean

Complete refurbishment of entire flats

17
Converted attic room with oak floorboards
Hallway with oak floorboards after the complete refurbishment
New fitted kitchen with oak plank flooring
Finished guest WC after the complete refurbishment
Attic room with oak floorboards after the conversion
Bright attic living space after refurbishment
New shower bathroom in the converted attic
Living space with sloping ceiling and oak floorboards
New roof terrace with wooden decking
New fitted kitchen with tiled floor in a period building
Room with restored double doors and pine floorboards
Fully refurbished bathroom with tub and washbasin
Bright period room with sanded pine floorboards
Room with arched window after the complete refurbishment
Period room with two arched windows and pine floorboards
Kitchen with tiled floor and courtyard window
Living space with balcony door and pine floorboards

Renovation & painting

24
Hallway during painting works, floor covered with protective fleeceWork in progress
Living room during painting works, floor covered and light fitting wrappedWork in progress
Painting works with protective floor coveringWork in progress
Interior during the works – floor and light fitting protectedWork in progress
Staircase during the works, steps covered with painter's fleeceWork in progress
Freshly painted room, floor still covered with painter's fleeceWork in progress
Freshly skimmed and painted room
Room with new vinyl flooring after refurbishment
Hallway with new flooring and apartment door
Fully renovated room with oak floorboards
Bright attic room with new wooden floor after the conversion
Living space during painting works, floor coveredWork in progress
Interior during renovation with protective coveringWork in progress
Living space during painting works, floor coveredWork in progress
Interior during renovation with protective coveringWork in progress
Fully renovated living space with new flooring
Bright room after completion of the renovation
Converted attic room with oak floorboards
Fully renovated living space with new flooring
Bright room after completion of the renovation
Converted attic room with oak floorboards
Fully renovated period room with restored floorboards
Fully renovated period room with restored floorboards
Radiator and pipework during the renovationWork in progress

Bathrooms & plumbing

45
Period bathroom during strip-out: tiles knocked off, the old tub full of debrisBefore
Bathroom with old tiles before renovationBefore
Existing bathroom with old tiles before refurbishmentBefore
Corroded water pipe before replacementBefore
Bathroom during filling and painting worksWork in progress
Waterproofing in the shower area with linear drainWork in progress
Sealed floor with sealing tape before tilingWork in progress
New waste pipe and trap fitted under the washbasinWork in progress
New bath mixer being fitted to the wall connectionsWork in progress
New trap with angle valves and connection hoses under the washbasin
New shower room with the shower on the window wall and new sanitary fittings
New shower room with walk-in shower
New washbasin unit with mirror in the refurbished bathroom
Refurbished bathroom with a glass-screened shower and towel radiator
Finished tiled shower with glass screen
New bathtub with fittings
New shower bathroom in the converted attic
Existing bathroom before refurbishmentBefore
Damage in the bathroom before refurbishmentBefore
Existing bathroom before refurbishmentBefore
Damage in the bathroom before refurbishmentBefore
Existing bathroom before refurbishmentBefore
Bathroom during refurbishment: sealing and tilingWork in progress
Sanitary installation during the worksWork in progress
Bathroom refurbishment in progressWork in progress
Bathroom during refurbishment: sealing and tilingWork in progress
Sanitary installation during the worksWork in progress
Bathroom refurbishment in progressWork in progress
Bathroom during refurbishment: sealing and tilingWork in progress
Sanitary installation during the worksWork in progress
Bathroom refurbishment in progressWork in progress
Bathroom during refurbishment: sealing and tilingWork in progress
Fully refurbished bathroom
New bathroom after completion of the works
Refurbished bathroom with new sanitary fittings
Fully refurbished bathroom
New bathroom after completion of the works
Refurbished bathroom with new sanitary fittings
Fully refurbished bathroom
New bathroom after completion of the works
Refurbished bathroom with new sanitary fittings
Existing bathroom with old tiles before refurbishmentBefore
Existing shower tray before replacementBefore
Existing bathroom with old tiles before refurbishmentBefore
Existing shower tray before replacementBefore

Refurbishment & interior fit-out

17
Converted, bright basement room with new tiled flooring and small cellar windows
New fitted kitchen after the fit-out
New fitted kitchen with oven after refurbishment
Converted basement room with coving and new tiled floor
Converted room with natural stone wall and indirect lighting
Room with indirect LED lighting and new flooring
Room with coving, indirect LED lighting and new flooring
Staircase with new step lighting
Stairs down from the landing with new plank flooring after the conversion
Converted attic with oak floorboards
Finished attic room with oak floorboards
Basement wall with damp traces before refurbishmentBefore
Converted living space after refurbishment
New fitted kitchen after the interior fit-out
Completed interior fit-out with indirect lighting
Converted living space after refurbishment
New fitted kitchen after the interior fit-out

Stairwells & property maintenance

12
Well-kept stairwell in a period building
Cleaned building entrance with staircase
Stairwell after cleaning
Landing and flight of stairs in a period building
Well-kept stairwell in a period building
Cleaned building entrance with staircase
Stairwell after cleaning
Landing and flight of stairs in a period building
Well-kept stairwell in a period building
Cleaned building entrance with staircase
Stairwell after cleaning
Landing and flight of stairs in a period building

Exterior, façade & winter service

7
Façade with scaffolding and a cleared courtyard in winterWork in progress
Cleared and gritted pavement during winter service
Gritted courtyard during winter service
Freshly gritted surface during winter service
Cleared and gritted pavement along the street during winter service
Freshly gritted surface during winter service
Cleared and gritted pavement during winter service

Your project next?

Request your free fixed-price quote now – with no obligation and full transparency on the agreed scope of work.

WhatsApp: +49 157 86846404

CallGet a quote